Keepshut London was appointed to deliver full flat entrance fire door remedial works and the installation of over 300 fire doors at Avante Court. The fire door works formed a key part of a wider £250,000 fire remediation project aimed at bringing the building into full compliance with current fire safety regulations.
The project was carefully managed over a six-month period, requiring detailed planning, phased delivery and close coordination with stakeholders to minimise disruption to residents while maintaining programme efficiency. All fire doors were inspected, repaired or replaced where required to ensure they met the relevant fire performance and compliance standards.
Our structured approach ensured fire door works were delivered in line with the building’s fire strategy and regulatory requirements. Ongoing quality checks and documentation supported compliance and provided clear records for duty holders and managing agents.
This project demonstrates Keepshut London’s experience delivering large-scale fire door remediation and installation programmes within occupied residential buildings, supporting long-term compliance with fire safety regulations through well-managed and controlled delivery.
Project Gallery

TESTIMONIAL
The best fire door services we have on our supply chain
Director Building Services